The attic apartment is complete and engineer, Jorge, has shared a video. I have not yet seen the apartment complete, and so the video is the current testament of a job well done.
Video starts on the stairs of the second floor terrasse and moves into the entry.
He is then moving into the kichenette, showing of the connected ventilation module.
The into the bathroom and showing of the shower enclosure and the toilet.
Showing of the slkiding door.
He is walking to the walkway and into the second bedroom the first door on the left.
The second bedroom has a window faceing the terrasse. Then the camera goes across the hallway to what I think will be a storage room.
Last part is going through the new door and into the master bedroom.