Outdoor stair tiles in place
Sun, 28 Sep 2025 10:55:00 UTC

I was away for the week - travelling to Denmark, so coming back I was eager to record the progress.
This construction team took advantage of my absence in the second floor apartment, to tile the outdoor stairs between the first and second floor.
Inside the first floor the "artsy" british racing green tile work has started.

Also new info is that the floor tiles for the entire first floor apartment arrived on friday, the week before. The first floor will be the same tile in the entire apartment. Outside the apartment - the entry and stairs - the original terrasso tile is kept in place. On the outside - the tile is the same as on the roof top terrasse and the stairs. This included in the two first floor outdoor rooms; bathroom and washing room.

Floor tiles arrived!