Kitchen zink, backsplash and intercom
Sun, 18 Oct 2026 9:37:00 UTC


Luis completed the backsplash. Remaining work is to install the osmosis water filter, the exhausts, one drawer under the owen and missing fronts on the refrigerator/freezer and dishwasher.

The plumber came back and installed the faucets and the zink.

On the electrical side, the intercom was installed and so was the oven and induction top. Intercom working but the buzzer is not working yet.


In the courtyard Peter helped me carry to Kamado into the courtyard. Also I captured a spectaular picture with Camilla walking the stairs. Picture taken from the courtyard towards the top floor.